Green Formwork Table System
Green Formwork is the perfect slab formwork solution for flat-slab or beam-less structure projects. This advanced aluminium/steel panel prop formwork system allows for early stripping operations, offering efficient solutions for modern concrete structure projects.
Simple & Innovative
- Minimal components: Steel frames and bamboo plywood panels
- Prop with quick release mechanism
- No cross braces or tripods required
- Easy horizontal and vertical transfer
Fast & Efficient
- 3-4 worker team for erection and removal
- 60-80m² of work completed per man per day
- Significant reduction in labor time
Safe & Reliable
- Stable system with 6-direction locking restriction
- Ergonomic design: No lifting above shoulder height
Installation & Application
The Bamboo Plywood Slab Beam System provides a versatile building material solution for concrete prop accessories, roofing formwork, and complex construction requirements.
Manufacturing Excellence
As a leading manufacturer and supplier of scaffolding and formwork systems, we utilize advanced production techniques to ensure high-quality output. Our scaffolding components are crafted to meet BS1139 and EN74/EN74B standards, ensuring international reliability.
Our product range includes slab and column/wall formwork, with the patented Green Formwork recognized as a leading solution for safety and speed in slab formwork globally.
Frequently Asked Questions
What makes Green Formwork different from traditional systems?
It uses a unique quick-release prop and integrated steel/bamboo panels, allowing for early stripping and much faster cycle times without the need for cross braces.
What is the primary material used in the panels?
The panels are constructed using high-tensile steel frames combined with durable bamboo plywood for an optimal balance of strength and weight.
Is the system safe for workers to install?
Yes, the system features a 6-direction locking restriction for stability and is designed so that no human lifting above shoulder height is required during installation.
What international standards do your products comply with?
Our scaffolding and formwork components meet BS1139 (1982&1991) and EN74/EN74B standards, ensuring they are suitable for global construction projects.
How much area can a standard team cover in a day?
A typical team of 3-4 workers can achieve approximately 60-80m² of formwork erection or removal per man per day.