🛠️
Product Description
Our Color Coated Aluminium Coils are engineered for durability and aesthetic versatility. Ideal for roofing, ceilings, and home appliances, these coils offer superior protection with various coating types including PVDF and PE.
| Category |
Specifications & Details |
| Alloy |
1000series / 3000series / 5000series / 8000series |
| Thickness |
0.2~1.5mm |
0.3~0.5mm |
0.209~0.425mm |
0.03~1.5mm |
| Max Width |
2000mm |
| Coating |
PE/HDP/PVDF/NANO, Anti-scratch, Anti-static, Chameleon, Food grade |
| Applications |
Roofing System |
Home Appliances |
EOE Packing |
Food packing/ACP |
🏢
Production Capacity & Facilities
With a comprehensive focus on R&D, manufacturing, and sales of prepainted aluminium coils (PPAL), prepainted steel coils (PCM), and solid aluminium sheets. Operating with advanced color coating lines, slitting and cutting production lines, and decorative energy-saving composite panel lines. Annual production capacity reaches 100,000MT for PPAL and 120,000MT for PCM.
Workshop & Exhibition Showcase:
❓
Frequently Asked Questions
How can I get some samples?
We are honored to offer you samples. New clients are expected to pay for the courier cost. The samples are free for you, and this charge will be deducted from the payment for formal orders.
Are you a manufacturer?
Yes, we are. We operate our own professional factory facilities. Customers are always welcome to visit our production lines.
Do you have any certificates for quality assurance?
Our products have passed strict inspections of SGS, ISO9001, and CTC. Quality is our culture, and our QC department checks every process from beginning to end.
What information is required for an accurate quotation?
Kindly share the alloy type, width, thickness, color, and specific application. Providing pictures or design sketches is highly recommended for clarification.
Can you handle custom designs and logos?
Yes, we usually produce goods based on customers' samples, logos, or specific size requirements provided by the client.
What if my order quantity does not reach the MOQ?
If the quantity cannot reach the Minimum Order Quantity, additional expenses may be required to cover production setup costs.